Skip to main content
  • Cistern Lift Arm And C Links Pack

Image 1 of 1

Product Information

Cistern Lift Arm and C Links Pack

Brand

None

Effects and Finish

Matt

Fitting Instructions

Ensure existing lever has a square shank to suit square hole in the lift arm. Holding the lever horizontally fit one of the C-links through the end hole of the lifter and check the c-link falls vertically to the centre line of the siphonpiston rod hole. If the c-link is at an angle then move the c-link along the holes in the lift arm until it falls vertically. Make sure the lver is at least horizontal or biased upwards before connecting the c-link to the siphon piston rod. Connect c-link to piston rod and the lift arm. Make sure the lever pulls the the piston rod fully upwards. If in doubt consult a qualified plumber.

Material

Rubber

Quantity In Pack

1
Delivery

Delivery costs will be calculated at checkout for your order.

Smaller items - £6
Larger items (may require two people to deliver) - £20
Bulkier/heavy items (e.g. Kitchens & Bathroom suites) - £30

Please note postcode exclusions apply.
If ordering multiple items, we’ll only charge you once based on the largest item ordered.

Some products may be delivered from the supplier. On selected large/bulky products our customer service team, or in some cases our suppliers, will contact you to arrange a delivery date.

View full delivery details.

Click & Collect

Click & Collect is usually available at your local store in 1 hour. Items will be held for 5 days.

Returns & Refunds

We'll happily refund you for any items you return to us in an unused and resaleable condition, within 30 days of receipt. Exclusions apply. View our Returns & Refunds policy.

Cistern Lift Arm And C Links Pack

SKU: 351236
£6.00

Quantity

Next day delivery available

Order before 4pm Sun-Fri

Available in stores

Store pickup: Free

    Product Information

    Cistern Lift Arm and C Links Pack

    Brand

    None

    Effects and Finish

    Matt

    Fitting Instructions

    Ensure existing lever has a square shank to suit square hole in the lift arm. Holding the lever horizontally fit one of the C-links through the end hole of the lifter and check the c-link falls vertically to the centre line of the siphonpiston rod hole. If the c-link is at an angle then move the c-link along the holes in the lift arm until it falls vertically. Make sure the lver is at least horizontal or biased upwards before connecting the c-link to the siphon piston rod. Connect c-link to piston rod and the lift arm. Make sure the lever pulls the the piston rod fully upwards. If in doubt consult a qualified plumber.

    Material

    Rubber

    Quantity In Pack

    1
    Delivery

    Delivery costs will be calculated at checkout for your order.

    Smaller items - £6
    Larger items (may require two people to deliver) - £20
    Bulkier/heavy items (e.g. Kitchens & Bathroom suites) - £30

    Please note postcode exclusions apply.
    If ordering multiple items, we’ll only charge you once based on the largest item ordered.

    Some products may be delivered from the supplier. On selected large/bulky products our customer service team, or in some cases our suppliers, will contact you to arrange a delivery date.

    View full delivery details.

    Click & Collect

    Click & Collect is usually available at your local store in 1 hour. Items will be held for 5 days.

    Returns & Refunds

    We'll happily refund you for any items you return to us in an unused and resaleable condition, within 30 days of receipt. Exclusions apply. View our Returns & Refunds policy.

    Share your style

    homebase